page_banner

Special Design for Sewage Treatment System Project - Nanchang City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of Sewage Treatment System, Domestic Sewage Treatment, Centralized Sewage Treatment Plant, Welcome all prospects of residence and abroad to visit our organization, to forge a outstanding potential by our cooperation.
Special Design for Sewage Treatment System Project - Nanchang City, China – JDL Detail:

Location: Nanchang City, China

Time: 2018

Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government selected JDL FMBR technology and adopted the decentralized treatment idea of “Collect, Treat and Reuse the Wastewater On-sit”.

Ten decentralization wastewater treatment plants were set up around the Wusha River basin, and it just took only 2 months for one of the WWTP’s construction work. The project has a wide range of treatment points, however, thanks to FMBR’s characteristic of simple operation, it does not need professional staffs like the traditional wastewater treatment plant to stay on the site. Instead, it uses the Internet of Things + Cloud Platform Central Monitoring System and mobile O&M station to shorten the response time on site, so as to realize long-term and stable operation of wastewater facilities under the unattended conditions. The effluent of the project can meet the standard, and the main indexes meet the Water Reuse Standard. The effluent replenishes the Wusha river to make the river clean. At the same time, the plants were design to integrate the local landscape, realizing the harmonious coexistence of wastewater facilities and surrounding environment.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

Special Design for Sewage Treatment System Project - Nanchang City, China – JDL detail pictures


Related Product Guide:

In the past few years, our business absorbed and digested advanced technologies both equally at home and abroad. In the meantime, our company staffs a group of experts devoted to your advancement of Special Design for Sewage Treatment System Project - Nanchang City, China – JDL , The product will supply to all over the world, such as: Rio de Janeiro, Egypt, Argentina, Now, we professionally supplies customers with our main merchandise And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Wendy from Greece - 2018.10.09 19:07
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Cara from Kuwait - 2018.09.21 11:44
    Write your message here and send it to us