page_banner

Professional Design Sewage Treatment System Construction - Nanchang City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With a positive and progressive attitude to customer's curiosity, our organization repeatedly improves our products top quality to meet the wants of consumers and further focuses on safety, reliability, environmental necessities, and innovation of Wastewater Treatment Equipment Plan, Water Pollution Control Technology Construction, Wastewater Treatment Equipment Proposal, In our efforts, we already have many shops in China and our products have won praise from customers worldwide. Welcome new and old customers to contact us for the future long term business relationships.
Professional Design Sewage Treatment System Construction - Nanchang City, China – JDL Detail:

Location: Nanchang City, China

Time: 2018

Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government selected JDL FMBR technology and adopted the decentralized treatment idea of “Collect, Treat and Reuse the Wastewater On-sit”.

Ten decentralization wastewater treatment plants were set up around the Wusha River basin, and it just took only 2 months for one of the WWTP’s construction work. The project has a wide range of treatment points, however, thanks to FMBR’s characteristic of simple operation, it does not need professional staffs like the traditional wastewater treatment plant to stay on the site. Instead, it uses the Internet of Things + Cloud Platform Central Monitoring System and mobile O&M station to shorten the response time on site, so as to realize long-term and stable operation of wastewater facilities under the unattended conditions. The effluent of the project can meet the standard, and the main indexes meet the Water Reuse Standard. The effluent replenishes the Wusha river to make the river clean. At the same time, the plants were design to integrate the local landscape, realizing the harmonious coexistence of wastewater facilities and surrounding environment.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

Professional Design Sewage Treatment System Construction - Nanchang City, China – JDL detail pictures


Related Product Guide:

Our company has been concentrating on brand strategy. Customers' pleasure is our greatest advertising. We also source OEM service for Professional Design Sewage Treatment System Construction - Nanchang City, China – JDL , The product will supply to all over the world, such as: Hamburg, Mauritius, Naples, Certainly, competitive price, suitable package and timely delivery will be assured as per customers' demands. We sincerely hope to build business relationship with you on the basis of mutual benefit and profit in the very near future. Warmly welcome to contact us and become our direct cooperators.
  • The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Elva from Egypt - 2018.11.22 12:28
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Mandy from Madras - 2018.06.12 16:22
    Write your message here and send it to us