page_banner

OEM/ODM Manufacturer Mbr Sewage Treatment Plant Project - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

High quality Very first,and Consumer Supreme is our guideline to offer the most beneficial service to our consumers.At present, we're attempting our greatest to be among the top exporters in our area to fulfill buyers far more need to have for Advanced Sewage Treatment Plant, Water Pollution Control Equipment Proposal, Advanced Biological Sewage Treatment Design Construction, Leading the trend of this field is our persistent objective. Supplying first class solutions is our intention. To create a beautiful upcoming, we wish to cooperate with all close friends in the home and overseas. Should you have got any interest in our products and solutions, remember to never wait to call us.
OEM/ODM Manufacturer Mbr Sewage Treatment Plant Project - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

OEM/ODM Manufacturer Mbr Sewage Treatment Plant Project - Chongqing City, China – JDL detail pictures

OEM/ODM Manufacturer Mbr Sewage Treatment Plant Project - Chongqing City, China – JDL detail pictures


Related Product Guide:

We know that we only thrive if we could guarantee our combined price tag competiveness and quality advantageous at the same time for OEM/ODM Manufacturer Mbr Sewage Treatment Plant Project - Chongqing City, China – JDL , The product will supply to all over the world, such as: Bhutan, Sri Lanka, Cannes, We are fully aware of our customer's needs. We provide high quality products, competitive prices and the first class service. We would like to establish good business relationships as well as friendship with you in the near future.
  • The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Rita from Morocco - 2017.02.18 15:54
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Debby from Serbia - 2017.03.08 14:45
    Write your message here and send it to us