page_banner

OEM/ODM Manufacturer Advanced Biological Wastewater Treatment System Plan - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Well-run equipment, specialist income crew, and better after-sales services; We're also a unified major family, anyone stay with the organization value "unification, determination, tolerance" for Centralized Sewage Treatment Design, Advanced Wastewater Treatment System, Sewage Treatment Consulting, We sincerely welcome close friends to barter company and start cooperation with us. We hope to affix hands with mates in different industries to make a excellent future.
OEM/ODM Manufacturer Advanced Biological Wastewater Treatment System Plan - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

OEM/ODM Manufacturer Advanced Biological Wastewater Treatment System Plan - Chongqing City, China – JDL detail pictures

OEM/ODM Manufacturer Advanced Biological Wastewater Treatment System Plan - Chongqing City, China – JDL detail pictures


Related Product Guide:

We take pleasure in an exceptionally excellent status between our buyers for our superb merchandise good quality, aggressive price tag and the greatest support for OEM/ODM Manufacturer Advanced Biological Wastewater Treatment System Plan - Chongqing City, China – JDL , The product will supply to all over the world, such as: Estonia, Mali, Italy, Now, we are trying to enter new markets where we do not have a presence and developing the markets we have now the already penetrated. On account of superior quality and competitive price , we'll be the market leader, be sure to don??¥t hesitate to contact us by phone or email, if you are interested in any of our solutions.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Laurel from Karachi - 2017.10.25 15:53
    The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Natividad from Latvia - 2018.12.25 12:43
    Write your message here and send it to us