page_banner

OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear "Customer first, Quality first" in mind, we work closely with our customers and provide them with efficient and professional services for Domestic Sewage Treatment, Mbr Sewage Treatment Plant Plan, Mbr Wastewater Treatment System, We welcome new and outdated clients from all walks of daily life to get hold of us for long term organization associations and achieving mutual results!
OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL Detail:

Location: Bajing Town, China

Time: 2014

Treatment Capacity: 2,000 m3/d

WWTP Type: Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended. In order to achieve efficient wastewater treatment, the local government finally selected the JDL FMBR technology after study. The treatment capacity of the project is 2,000m3/d, the footprint of FMBR equipment is only 200m2, and the overall footprint of the WWTP is about 670m2. The sewage treatment plant is located nearby in a residential community, and the plant area is covered with plantings which is integrated with the landscape of the residential community. Since the completion of the project, the stable operation has been achieved, and the effluent quality has reached the standard of wastewater reuse.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL detail pictures

OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL detail pictures

OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL detail pictures


Related Product Guide:

We will constantly satisfy our respected customers with our good excellent, superior value and superior assistance due to we're additional experienced and far more hard-working and do it in cost-effective way for OEM Manufacturer Wastewater Treatment Plant Project - Bajing Town, China – JDL , The product will supply to all over the world, such as: Qatar, Benin, Finland, Look forward to the future, we will focus more on the brand building and promotion . And in the process of our brand global strategic layout we welcome more and more partners join us, work together with us based on mutual benefit. Let's develop market by fully utilizing our comprehensive advantages and strive for building.
  • In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
    5 Stars By James Brown from Swansea - 2017.11.12 12:31
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Kevin Ellyson from Uganda - 2017.12.09 14:01
    Write your message here and send it to us