page_banner

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are proud of the high customer satisfaction and wide acceptance due to our persistent pursuit of high quality both on product and service for Sewage Treatment Design Proposal, Mbr Wastewater Treatment, Municipal Wastewater Treatment System, Any interest, make sure you really feel free to get hold of us. We're searching forward to forming prosperous enterprise interactions with new purchasers across the earth within the near upcoming.
Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL detail pictures

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL detail pictures


Related Product Guide:

To be a result of ours specialty and repair consciousness, our corporation has won an excellent reputation amongst customers all around the entire world for Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL , The product will supply to all over the world, such as: Greek, Finland, Berlin, We critically promise that we deliver all the customers with the best quality solutions, the most competitive prices and the most prompt delivery. We hope to win a resplendent future for customers and ourselves.
  • The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Darlene from Adelaide - 2018.09.16 11:31
    On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!
    5 Stars By Alberta from Florida - 2018.06.26 19:27
    Write your message here and send it to us