page_banner

Hot sale Advanced Biological Wastewater Treatment Design Proposal - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We pursue the administration tenet of "Quality is exceptional, Assistance is supreme, Reputation is first", and will sincerely create and share success with all clients for Wastewater Treatment Plant Project, Wastewater Treatment Technology Proposal, Advanced Wastewater Treatment Technology, We've been willing to provide you with the lowest selling price during the market place, greatest high quality and quite nice sales service.Welcome to do bussines with us,let's be double win.
Hot sale Advanced Biological Wastewater Treatment Design Proposal - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

Hot sale Advanced Biological Wastewater Treatment Design Proposal - Chongqing City, China – JDL detail pictures

Hot sale Advanced Biological Wastewater Treatment Design Proposal - Chongqing City, China – JDL detail pictures


Related Product Guide:

To be able to give you benefit and enlarge our business, we also have inspectors in QC Team and assure you our greatest service and products for Hot sale Advanced Biological Wastewater Treatment Design Proposal - Chongqing City, China – JDL , The product will supply to all over the world, such as: Ecuador, America, Angola, Besides strong technical strength, we also introduce advanced equipment for inspection and conduct strict management. All the staff of our company welcome friends both at home and abroad to come for visits and business on the basis of equality and mutual benefit. If you are interested in any of our items, please feel free to contact us for quotation and product details.
  • This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Clementine from Zurich - 2018.09.19 18:37
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Alexander from Cologne - 2018.09.08 17:09
    Write your message here and send it to us