page_banner

Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Town of Plymouth, USA – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Dedicated to strict top quality command and considerate purchaser support, our experienced staff customers are always available to discuss your necessities and be certain full client gratification for Sewage Treatment Plant Construction, Advanced Biological Sewage Treatment Consulting, Water Pollution Control Plant, Good quality, timely service and Competitive price, all win us a good fame in xxx field despite the international intense competition.
Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Town of Plymouth, USA – JDL Detail:

Location: Town of Plymouth, USA

Time: 2019

Treatment Capacity: 19m3/d

WWTP Type: Integrated FMBR Equipment WWTP

Process: Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In March 2018, in order to discover the leading edge new technologies in the field of wastewater treatment and achieve the goal of reducing the energy consumption of wastewater treatment, Massachusetts, as a global clean energy center, publicly solicited cutting-edge technologies for wastewater treatment globally, which was hosted by Massachusetts clean energy center (MASSCEC), and carried out innovative technology pilot in the public or authorized wastewater treatment area of Massachusetts.

The MA State Environmental Protection Agency organized authoritative experts to conduct a one-year rigorous assessment of the energy consumption benchmarks, estimated consumption reduction targets, engineering plans, and standard requirements of the collected technical solutions. In March 2019, the Massachusetts government announced that Jiangxi JDL Environmental Protection Co., Ltd.’s “FMBR Technology” was selected and granted the highest funding ($ 150,000), and a pilot will be conducted at the Plymouth Airport Wastewater Treatment Plant in Massachusetts.

The effluent treated by FMBR equipment is generally stable since the operation of the project, and the average value of each index is better than the local discharge standard (BOD≤30mg/L, TN≤10mg/L).

The average removal rate of each index is as follows:

COD: 97%

Ammonia nitrogen: 98.7%

Total nitrogen: 93%

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Town of Plymouth, USA – JDL detail pictures


Related Product Guide:

We support our purchasers with ideal premium quality products and substantial level company. Becoming the specialist manufacturer in this sector, we've acquired rich practical working experience in producing and managing for Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Town of Plymouth, USA – JDL , The product will supply to all over the world, such as: Lebanon, Cambodia, Uruguay, Our solutions are produced with the best raw materials. Every moment, we constantly improve the production programme. In order to ensure better quality and service, we now have been focusing on the production process. We have got high praise by partner. We are looking forward to establishing business relationship with you.
  • It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Deborah from Karachi - 2018.12.05 13:53
    The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Caroline from Rotterdam - 2017.12.09 14:01
    Write your message here and send it to us