page_banner

factory Outlets for Wastewater Treatment Equipment Consulting - Nanchang City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We stay with the basic principle of "quality initially, services first, steady improvement and innovation to fulfill the customers" for your management and "zero defect, zero complaints" as the quality objective. To perfect our company, we give the goods while using the good high-quality at the reasonable selling price for Decentralized Sewage Treatment, Sewage Treatment System Consulting, Membrane Sewage Treatment, We, with fantastic passion and faithfulness, are willing to offer you with best services and striding forward with you to make a bright foreseeable future.
factory Outlets for Wastewater Treatment Equipment Consulting - Nanchang City, China – JDL Detail:

Location: Nanchang City, China

Time: 2018

Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government selected JDL FMBR technology and adopted the decentralized treatment idea of “Collect, Treat and Reuse the Wastewater On-sit”.

Ten decentralization wastewater treatment plants were set up around the Wusha River basin, and it just took only 2 months for one of the WWTP’s construction work. The project has a wide range of treatment points, however, thanks to FMBR’s characteristic of simple operation, it does not need professional staffs like the traditional wastewater treatment plant to stay on the site. Instead, it uses the Internet of Things + Cloud Platform Central Monitoring System and mobile O&M station to shorten the response time on site, so as to realize long-term and stable operation of wastewater facilities under the unattended conditions. The effluent of the project can meet the standard, and the main indexes meet the Water Reuse Standard. The effluent replenishes the Wusha river to make the river clean. At the same time, the plants were design to integrate the local landscape, realizing the harmonious coexistence of wastewater facilities and surrounding environment.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

factory Outlets for Wastewater Treatment Equipment Consulting - Nanchang City, China – JDL detail pictures


Related Product Guide:

To be a result of ours specialty and service consciousness, our enterprise has won an excellent status between buyers all around the globe for factory Outlets for Wastewater Treatment Equipment Consulting - Nanchang City, China – JDL , The product will supply to all over the world, such as: Nepal, Portugal, venezuela, For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
  • Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Sabina from Mombasa - 2018.05.13 17:00
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Joanna from Georgia - 2017.09.28 18:29
    Write your message here and send it to us