page_banner

Factory Free sample Mbr Sewage Treatment Technology Project - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We try for excellence, service the customers", hopes to be the most effective cooperation workforce and dominator company for staff, suppliers and shoppers, realizes price share and ongoing marketing for Municipal Wastewater Treatment Plant Construction, Wastewater Treatment System Plan, Mbr Sewage Treatment Plant Consulting, Currently, we are wanting ahead to even bigger cooperation with abroad customers according to mutual positive aspects. Be sure to sense free to contact us for more details.
Factory Free sample Mbr Sewage Treatment Technology Project - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:


Related Product Guide:

We know that we only thrive if we can guarantee our combined rate competiveness and good quality advantageous at the same time for Factory Free sample Mbr Sewage Treatment Technology Project - Chongqing City, China – JDL , The product will supply to all over the world, such as: Miami, Toronto, Swiss, Facing fierce global market competition, we have launched the brand building strategy and updated the spirit of "human-oriented and faithful service", with an aim to gain global recognition and sustainable development.
The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
5 Stars By Donna from Austria - 2018.09.21 11:44
High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
5 Stars By Page from Nicaragua - 2018.05.13 17:00
Write your message here and send it to us