page_banner

China wholesale Advanced Biological Sewage Treatment Proposal - Huizhou City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our rewards are reduce selling prices,dynamic revenue team,specialized QC,sturdy factories,superior quality services for Biological Wastewater Treatment System, Sewage Treatment Design Proposal, Water Pollution Control Design Proposal, Welcome to build the well and long standing business relationships with our company to create a glorious future together. customers' satisfaction is our eternal pursuit!
China wholesale Advanced Biological Sewage Treatment Proposal - Huizhou City, China – JDL Detail:

Location: Huizhou City, China

Treatment Capacity: 20,000 m3/d

WWTP Type: Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product wharf, fisher wharf, dragon bay, Qianjin wharf and residential areas along the coast. The WWTP is built on the seaside, close to the residential area, has a small footprint, few residual organic sludge discharging and no odor in daily operation, which does not affect the surrounding environment.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.

The traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

China wholesale Advanced Biological Sewage Treatment Proposal - Huizhou City, China – JDL detail pictures


Related Product Guide:

We know that we only thrive if we can guarantee our combined price tag competiveness and top quality advantageous at the same time for China wholesale Advanced Biological Sewage Treatment Proposal - Huizhou City, China – JDL , The product will supply to all over the world, such as: America, Riyadh, Orlando, Besides there are also professional production and management , advanced production equipment to assure our quality and delivery time , our company pursues the principle of good faith, high-quality and high-efficiency. We guarantee that our company will try our best to reduce customer purchase cost, shorten the period of purchase, stable products quality, increase customers' satisfaction and achieve win-win situation .
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Octavia from Belarus - 2018.06.26 19:27
    A good manufacturers, we have cooperated twice, good quality and good service attitude.
    5 Stars By Judy from Bandung - 2017.03.28 12:22
    Write your message here and send it to us