page_banner

2020 wholesale price Advanced Biological Sewage Treatment System Plan - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the principle of "Super Quality, Satisfactory service" ,We have been striving for being a superb small business partner of you for Advanced Biological Wastewater Treatment Plant, Sewage Treatment Design Project, Mbr Sewage Treatment Design Plan, Our mission is to help you create long-lasting relationships with your clients through the power of promotional products.
2020 wholesale price Advanced Biological Sewage Treatment System Plan - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

2020 wholesale price Advanced Biological Sewage Treatment System Plan - Chongqing City, China – JDL detail pictures

2020 wholesale price Advanced Biological Sewage Treatment System Plan - Chongqing City, China – JDL detail pictures


Related Product Guide:

We are experienced manufacturer. Wining the majority from the crucial certifications of its market for 2020 wholesale price Advanced Biological Sewage Treatment System Plan - Chongqing City, China – JDL , The product will supply to all over the world, such as: Luxemburg, Nicaragua, Malaysia, We also have the strong ability of integration to supply our best service, and plan to build the warehouse in the different countries around the world, that will probably be more conveniently to service our customers.
  • On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!
    5 Stars By Arabela from Madras - 2018.02.08 16:45
    The company's products can meet our diverse needs, and the price is cheap, the most important is that the quality is also very nice.
    5 Stars By Tina from Philippines - 2018.11.28 16:25
    Write your message here and send it to us