page_banner

2020 China New Design Domestic Wastewater Treatment - Nanchang City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We believe in: Innovation is our soul and spirit. Quality is our life. Customer need is our God for Advanced Biological Sewage Treatment Design Construction, Mbr Sewage Treatment Technology Construction, Water Pollution Control Technology Plan, We appreciate your enquiry and it's our honor to work with every friend worldwide.
2020 China New Design Domestic Wastewater Treatment - Nanchang City, China – JDL Detail:

Location: Nanchang City, China

Time: 2018

Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government selected JDL FMBR technology and adopted the decentralized treatment idea of “Collect, Treat and Reuse the Wastewater On-sit”.

Ten decentralization wastewater treatment plants were set up around the Wusha River basin, and it just took only 2 months for one of the WWTP’s construction work. The project has a wide range of treatment points, however, thanks to FMBR’s characteristic of simple operation, it does not need professional staffs like the traditional wastewater treatment plant to stay on the site. Instead, it uses the Internet of Things + Cloud Platform Central Monitoring System and mobile O&M station to shorten the response time on site, so as to realize long-term and stable operation of wastewater facilities under the unattended conditions. The effluent of the project can meet the standard, and the main indexes meet the Water Reuse Standard. The effluent replenishes the Wusha river to make the river clean. At the same time, the plants were design to integrate the local landscape, realizing the harmonious coexistence of wastewater facilities and surrounding environment.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

2020 China New Design Domestic Wastewater Treatment - Nanchang City, China – JDL detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm to the long-term to develop together with consumers for mutual reciprocity and mutual advantage for 2020 China New Design Domestic Wastewater Treatment - Nanchang City, China – JDL , The product will supply to all over the world, such as: Thailand, Estonia, Mauritius, We can meet the various needs of customers at home and abroad. We welcome new and old customers to come to consult & negotiate with us. Your satisfaction is our motivation! Let us work together to write a brilliant new chapter!
  • The company's products can meet our diverse needs, and the price is cheap, the most important is that the quality is also very nice.
    5 Stars By Elsie from Mumbai - 2018.12.28 15:18
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Arthur from Spain - 2017.05.21 12:31
    Write your message here and send it to us